Refine your search:     
Report No.
 - 
Search Results: Records 1-6 displayed on this page of 6
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Proposal of safe and secure maintenance method to realize long-term stable operation of electromagnet power supply

Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

JAEA-Technology 2021-005, 40 Pages, 2021/05

JAEA-Technology-2021-005.pdf:4.27MB

The 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to manipulate a high-intensity beam of 1 MW. These devices have been specially developed to meet the requirement to achieve acceleration of the 1-MW proton beams. State-of-the-art technologies are used to these devices. To achieve stable operation with few failures, and to prevent major troubles in the event of a failure, it is necessary to maintain the performance of the devices under the appropriate and accurate management strategy with an enough understanding of its characteristics. However, since the specification and function of each device is different respectively, and it is also produced by different manufacturer, we have to maintain adequately according to the structure, configuration and features of the apparatus. There are typically three major stages in the maintenance works. First, "Daily inspection" is constantly performed to monitor the status of the equipment during operation and check for any errors or abnormalities. Second, "Routine maintenance" is carried out weekly, monthly, or yearly to fix the errors, or to replace the parts that are deteriorated. Third, "Troubleshooting" is conducted to recover from sudden failures. In this report, we will introduce the specific contents of "Routine maintenance", "Daily inspection", and "trouble case" based on the experiences of the electromagnet power supply group. In particular, we will report the work management methods, including ideas for facilitating recovery work. We will also summarize the important points of a matter that does not depend on the configuration, structure, and characteristics of the equipment.

Journal Articles

Summary of dismantling project of a critical assembly, VHTRC

Yasuda, Hideshi

RANDEC Nyusu, (45), p.6 - 7, 2000/05

no abstracts in English

JAEA Reports

None

*; ; ; *

JNC TJ1400 99-026, 217 Pages, 1999/02

JNC-TJ1400-99-026.pdf:8.64MB

no abstracts in English

JAEA Reports

None

PNC TN8410 96-284, 245 Pages, 1996/03

PNC-TN8410-96-284.pdf:6.22MB

None

JAEA Reports

None

; ; ; ; Tanimoto, Kenichi; Terunuma, Seiichi

PNC TN9420 94-011, 154 Pages, 1994/03

PNC-TN9420-94-011.pdf:3.49MB

None

JAEA Reports

None

; ; ; ;

PNC TN8410 92-074, 133 Pages, 1992/04

PNC-TN8410-92-074.pdf:3.8MB

None

6 (Records 1-6 displayed on this page)
  • 1